# Sum of Estimates in the cycle (ideally also by assignee)

**URL:** <https://forum.plane.so/t/sum-of-estimates-in-the-cycle-ideally-also-by-assignee/208>\
**Category:** Feature requests\
**Tags:** business, commercial\
**Created:** [June 10, 2026, 5:55pm UTC](https://forum.plane.so/t/sum-of-estimates-in-the-cycle-ideally-also-by-assignee/208 "2026-06-10T17:55:30Z")\
**Posts on this page:** 3\
**Page:** 1

<div class="post-metadata">

**Author:** ![ancientjellyfish](https://forum.plane.so/letter_avatar_proxy/v4/letter/a/8baadc/32.png) [@ancientjellyfish](https://forum.plane.so/u/ancientjellyfish)\
**Post date:** [June 10, 2026, 5:55pm UTC](https://forum.plane.so/t/sum-of-estimates-in-the-cycle-ideally-also-by-assignee/208/1 "2026-06-10T17:55:30Z")

</div>

As a team we manage workload by looking at the sum of estimate points. In Jira there was also a way of seeing this per person which was really useful for seeing who had capacity within their current cycle/sprint.

---

<div class="post-metadata">

**Author:** ![imHarsha](https://forum.plane.so/letter_avatar_proxy/v4/letter/i/bb73d2/32.png) [@imHarsha](https://forum.plane.so/u/imHarsha)\
**Post date:** [June 11, 2026, 9:28am UTC](https://forum.plane.so/t/sum-of-estimates-in-the-cycle-ideally-also-by-assignee/208/2 "2026-06-11T09:28:38Z")

</div>

This is actually already possible with Dashboards. You can view estimate points per assignee within a cycle. You can also filter it for specific cycles.

I’ve also attached a screenshot for your reference.

 ![Screenshot 2026-06-11 at 2.55.06 PM](https://d3m58uaoh9xw7m.cloudfront.net/original/1X/ed55d3d77465abdf85ec80881d96ba701ee4d5de.jpeg)

---

<div class="post-metadata">

**Author:** ![ancientjellyfish](https://forum.plane.so/letter_avatar_proxy/v4/letter/a/8baadc/32.png) [@ancientjellyfish](https://forum.plane.so/u/ancientjellyfish)\
**Post date:** [June 11, 2026, 11:12am UTC](https://forum.plane.so/t/sum-of-estimates-in-the-cycle-ideally-also-by-assignee/208/3 "2026-06-11T11:12:30Z")

</div>

Thanks Harsha that’s good to know. However, for this use case, we need something that can be reviewed within the cycle window.

Could we add a sum of estimate points alongside the count of work items? We could then filter by assignee to see the total estimate points assigned to each individual. This would make it easier to review both the work items someone is actively working on and their overall capacity at the same time.

 ![image](https://d3m58uaoh9xw7m.cloudfront.net/original/1X/f7af763bacfee3a938c181cac0e9f54af42be2ea.png)